PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing rebar mats at Elev. 5,6 (3rd Floor) Facing South-West (800x600).jpg Backfilling and compacting along foundation wall at column line 6.5 (G-D) Facing South-East (800x600).jpg Backfilling and compacting the underground piping Facing North (800x600).jpg Building rebar mats for Elev. 5,6 (3rd Floor) Facing North-East (800x600).jpg Installing Domestic water and fire service pipes at Sprinkler Room (152A) Facing South (800x600).jpg Installing pour stops at Derrick -3 (2nd Floor) Facing South (800x600).jpg Pour Stops along edges of Derrick -3 (2nd Floor) Facing North-East (800x600).jpg Welded beam at Derrick -2  (800x600).jpg Before installing of pour stops Facing East (800x600).jpg
Previous pageNext page Installing Domestic water and fire service pipes at Sprinkler Room (152A) Facing South (800x600)
Installing Domestic water and fire service pipes at Sprinkler Room (152A) Facing South (800x600)